Projects and Repairs on the Property

Since the occupancy has been down due to the Covid-19 the maintenance staff has been able to catch up on many projects.

This is just a partial list of some of the projects and repairs that we have been doing over the past couple of months.

Painting: All the stairs and unit entry ways are being painted, and the handrails around the property have been painted.

The pavilion stairs where painted with yellow stripes for better vision at night.

Parking Lot: Painting of all the parking lot stripes and the lettering was painted.

Pool: The pool area is still maintained every day even though it is closed at this time. 

  • A new pool filter pump was installed. Repaired one of the steps when entering the pool.

BBQ: 3 out of the 8 were rebuilt due to rusting of the burners.

Landscaping: I had new Phakias planted behind buildings 3,4,5.

  • New plants were put around the base of several trees on the property.

Plumbing: Plumbing repairs were done in building #10, units, #368,268,168

A new toilet was installed in unit #118.

Ordered the new signs for Jeff Kern that was requested by the Board of Directors.

Trying to order parts for the dryers that are out of order.

Installed a new bench at the top smoking area by Lot1A.

There has been some water damage repair done to unit #158, building #8.

Mahalo,

– Johnny Johnson, Site Manager