Projects and Repairs

The following is a partial list of the projects and repairs that we have completed over the past few months.

  • Building #8 the units #163, #263, and #363 just had the main drains replaced as serval of the pipes cracked.
  • Building #4 units #223 and #123 had the main drain pipes replaced.
  • There was a minor leak from unit #219 into unit #119, building 4.
  • The Scheduling was made for May 2021 for the deck replacement for unit #321 as it leaked into unit #222 and unit #223.
  • Another palm tree was removed behind building three (3) it was leaning, and some owners thought it might fall.
  • There was work being done in building 9, unit #273. So, Gus LED Maui checked and repaired the pipes for that unit.
  • We received the OK to replace the electrical boxes on the back of building 5 and 6. This project will start next week and then we can install the new transformer.
  • I have discussed with Ethel, Jeff, Barry, and Gus about changing the walkway going to the laundry room entrance by building 6 to give more room for planting in front of the new electrical panels. (still in discussion)
  • We now have the new Pool Rules posted on the office/pool wall.
  • Replaced the plants on the end of the pool fence next to building 6.
  • The new driveway is finished being surfaced and striped.
  • The Kihei Kai Nani sign on the guard shack had fallen and broke. It is now repaired and has been put back up.
  • I purchased another Golf Cart for the property for the cost of $500.00. It is a nice upgrade.
  • I have had the tree over the Pavilion trimmed by Island Plant.
  • I am trying to get the other two trees that are hanging over buildings 12 and 13 trimmed.
  • I had the backflow system inspected last month, and all is good.